miércoles, 16 de marzo de 2011

Colocación de muro de block

HERRAMIENTA

  • Hilo de albañil
  • Carretilla
  • Nivel de mano
  • Cuchara de albañil
  • Cinta de medir
  • Tiralíneas

MATERIALES

  • Clavos para madera 2 ½”
  • Clavos de acero para concreto 1 ½”
  • Cemento
  • Agregado mixto
  • Arena # 4
  • Agua
  • Madera para cimbra
  • Alambre recocido

PROCEDIMIENTO

Se realiza el trazo del eje sobre la dala de desplante, primero se tomó el hilo de albañil y se amarro al eje de un extremo y se llevó al otro, después con el tira líneas, se estiro tomando de referencia el hilo que se encontraba en el sitio y se jalo para que este marcara el eje sobre la dala.

Una vez marcado el eje que se debe de seguir para colocar adecuadamente la hilada de blocks, se procedió a tomar un poco de mortero (cemento, agua, arena, en una proporción de 1:4) con la cuchara de albañil y se colocó sobre la dala de manera uniforme y con un centímetro de altura y 2 centímetros de ancho.

Después se colocó el primer block sobre el mortero, se tomó el nivel de mano y se colocó encima del block para verificar que el block se encontrara nivelado. En diversos casos, el block no se encontraba nivelado, por lo que se daba unos pequeños golpes con el mango de la cuchara del lado que se encontrara más alto, después de esto se volvió a verificar que se encontrara nivelado.

Se repitió varias veces el procedimiento de colocar mortero sobre la dala y el block, después del primer block, los siguientes, se les colocó mortero en la pared lateral, para que éste se adhiriera al block anteriormente colocado. También se verificó la nivelación del block con respecto al block anterior, esto se hacía al colocar el nivel en el lado frontal del block, si se encontraba desnivelado, se movía ligeramente el block hasta llegar a la alineación adecuada.

El último espacio que quedaba antes de colocar el ultimo block era de una dimensión mayor a la mitad del block, por lo que se decidió colocar una cabeza de block y después la mitad del block, para cubrir el espacio sobrante de la primera hilada.

Una vez terminada la primera hilada, se procedió a colocar la segunda hilada con el mismo método que la primera, con la diferencia de que ahora la primera pieza de block a colocar fue la mitad del block, de manera que las uniones entre los blocks se encuentren desplazadas y no todas sobre una misma línea. Este procedimiento se fue alternando hasta llegar a la altura requerida para la práctica.

Para terminar un muro de block, es necesario colocar un cerramiento, para poder realizar esto, se necesitó acero de refuerzo, la cimbra y concreto para colar el elemento. El acero de refuerzo fue un armex, el cual se cortó del largo del muro. Por otro lado, para hacer la cimbra, se buscó madera para colocarla en los castillos y a lo largo del cerramiento. Esta madera se fue colocando y amarrando con alambre recocido, para que cuando ya se encontrara el elemento colado, este no deformara la cimbra.

Se terminó de colocar la cimbra y se procedió a realizar el colado de concreto, este fue hecho con cemento, agua, arena 4 y grava 2. 











TOOLS
  • Thread
  • Wheelbarrow
  • Hand level
  • Mason’s trowel
  • Tape measure
  • Chalk powdered thread


MATERIALS
  • Nails for wood 2 ½”
  • Steel nails for concrete 1 ½”
  • Cement
  • Mixed aggregation
  • Sharp sand
  • Water
  • Wood for framework
  • Annealed wire


PROCEDURE

To draw the axis over the foundation beam, first we took the thread and tied up in the reinforcing steel for the wall, we tied it up in one side of the foundation beam and then we stretched it to the other side. So we had the thread well aligned to the axis. Later we took a chalk powder thread to mark the foundation beam, we pulled the thread and the powdered chalk made a mark.

Once we have marked the axis to follow correctly for placing the blocks, we took a mason’s trowel with mortar (cement, water, builder’s sand, in a proportion of 1:4) and we put the mortar on the foundation beam with 1 centimeter of height and two centimeters of width, for placing the first concrete block.

We placed the first block on the mortar, then with the hand level, we placed it on top of the block to verify the block was leveled. In several occasions, the block was not leveled, so we gave little shocks with the handle of the mason’s trowel to the side which was more elevated, after that we took the hand level again to verify if the block was leveled.

It was repeated several times the procedure of putting mortar on top of the foundation beam and placing the block, after the first block, for the next ones, we put mortar in the lateral side to make this one to adhere to the previous placed block. Also we verified the leveling of the blocks taking in consideration the previous placed block, to do that, we took the hand level and hold it in the frontal side of the block, if it was not leveled, we moved the block softly until getting to the right alignment.

In the last space, it was bigger than the half of the block, so we decided to place a head of the block and then a half piece of block to cover the distance which was left in the first row of blocks.

Once it was finished the first row, we started to place the second row with the same method as the first one, with the difference that now the first piece of block was the half block, in a way to make the unions between the blocks were displaced and not in a same line. This procedure was alternated until the required height for the practice.

To finish the concrete block wall, it is necessary to place a tie-beam, to do that, it was required reinforcement steel, formwork, and pouring concrete for the element. The reinforcement steel was a prefabricated, which we only cut in the dimension of the large of the wall. In the other side, to make the formwork, we looked for wood that better fit for the formwork; we secured the formwork with annealed wire to prevent when the element was poured with concrete that the formwork would not lose the form.

We finished pacing the formwork and then we poured the concrete, it was made of cement, water, sharp sand and gravel.


Conclusión

En esta práctica comprendimos en su totalidad la colocación de muro de block, ya que para poder realizar este trabajo se deben hacer pequeñas actividades que en conjunto logran el muro. Estas actividades son: trazo de eje, hacer el mortero, colocar adecuadamente el block y que este se encuentre nivelado, armado de cimbra y por último el realizar la mezcla de concreto y vaciarlo.

Cada una de estas pequeñas tareas son muy importantes porque al ocurrir un error en alguna, todo el proceso es afectado negativamente. Por ejemplo, a la hora de colocar el mortero, este debe de colocarse como se ha especificado, que se coloque de manera uniforme para que no sea más difícil colocar el block de concreto y que este no quede nivelado.

Al tener listo todas las hiladas de block, se procede a colocar en el sitio la cimbra, esta debe de quedar justa para el elemento a colar, si se deja floja, cuando ya tenga el concreto, se deformara la cimbra y en algunos casos, se puede salir el concreto de elemento que se ha colado. Y esto perjudica gravemente al proceso, por lo que en un caso asi se debe volver a realizar todo.

Conclusion 

In this practice, we understood completely the concrete block placement, because to do this work it is necessary to do little activities which come together and make the block wall. Those activities were: marking the axis, making the mortar, placing the block correctly and leveled, making the framework and last making the concrete and pour it.

Each one of these activities are very important because if there is a mistake in somewhere, all the process is going to be affected negatively. For example, when placing the mortar, it must be placed as specified, placing it uniformly for making it easier the time to placing the concrete block.

When finished the rows of the wall, the next procedure is to place the framework, it must be fair to the item, because if it is not in that way, when the concrete is poured, the framework is going to lose the shape and in some cases the concrete can be lost of the item.

1 comentario: